Thames Water's lead pipe replacement scheme replaces their section of a lead water pipe, the communication pipe in the street, once you have replaced your section, the supply pipe on your property. This guide explains who qualifies, how the process works step by step, and what the work on your side involves and costs.
Scheme status, October 2026: Thames Water say the scheme is temporarily closed in November and over the winter, and will reopen in spring 2027. Check Thames Water's lead pipe replacement page for the latest before you apply.
A lead water supply is usually two pipes joined at the outside stop valve, which sits near your boundary, often under a small cover in the pavement or front garden.
| Pipe | Where it runs | Who owns it | Who replaces it |
|---|---|---|---|
| Communication pipe | Water main in the street to the outside stop valve at your boundary | Thames Water | Thames Water, under the scheme |
| Supply pipe | Outside stop valve to the inside stop valve, usually under the kitchen sink | You | You, using a plumber you choose |
| Internal pipework | Everything inside the house after the stop valve | You | You, using a plumber you choose |
If your supply pipe is shared with a neighbour, you share responsibility for it. Each household is responsible for any branch that only feeds their own property.
Thames Water list these conditions. All of them need to apply:
Thames Water also accept applications where the supply pipe was replaced in the past, as long as you can provide photographic evidence. If you replace your pipe while the scheme is closed, keep photos of the open trench and your compliance certificate.
The scheme does not separate shared supplies. If you want your own independent supply, see our new water supply connection page.
To pass Thames Water's check, your new supply pipe needs to meet the Water Regulations. In practice that means:
Thames Water also recommend checking your electrical earthing if you have a lead supply pipe, especially in houses built before 1966. Older homes were sometimes earthed through the metal water pipe, and plastic pipe breaks that connection. An electrician or your electricity supplier can check this.
With an independent plumber, the trench has to stay open until Thames Water can inspect it, which can mean an open trench across your garden or drive for days. As WaterSafe approved contractors, we issue the compliance certificate ourselves, so the trench can be backfilled and reinstated the same day. You simply email the certificate to Thames Water.
Where the ground allows, we lay the new pipe by impact moling, with a small pit at each end instead of a trench.
For a typical London house, replacing the supply pipe from the outside stop valve to the house with new 25mm MDPE has come to £1,600 to £1,650 plus VAT on our recent quotes. That includes a new stopcock, drain-off valve and check valve, full reinstatement and the compliance certificate. Longer runs, hard surfaces and difficult access cost more. We give a fixed price after a free survey.
There is more detail on our lead pipe replacement page.
Until Thames Water have replaced their section, run your cold kitchen tap for about two minutes before using water for drinking or cooking. Once their replacement is complete, run every tap you use for drinking or cooking for 10 minutes on the first day.
Source: Thames Water, lead pipe replacement, checked 27 October 2026. Scheme rules can change, so always confirm with Thames Water before you apply.
Related guides: lead pipe replacement cost in London and separating a shared water supply.
